BROWN @ SiDet

 

Members:

Yuri Gershtein, Stelios Kesisoglou, Greg Landsberg, Alex Melnitchouk

 

Non-Brown:

Suyong Choi, Jim Fast, Ryan Hickey, Eric Kajfasz, Wayne Schmitt

 

Special THANKS to:

Bill Cooper, Marcel Demarteau, Hans Jostlein, Ron Lipton, Jorge Montes, Flera Rizatdinova

 

 

ALL   SIX    BARRELS

 ARE   ASSEMBLED!

 

FINAL SURVEY RESULTS:

 

·        Barrel #1

·        Barrel #2

·        Barrel #3

·        Barrel #4

·        Barrel #5

 

 

Silicon Ladders Installation and Alignment:

 

Requirements on ladder placement and survey precision (.doc)

 

Assembly procedure V 1.1

 

 >>> SHIFT SCHEDULE <<<

 

BARREL’s INSTALLATION SPREADSHEETS

 

Barrel #1 Installation spreadsheet

Barrel #2 Installation spreadsheet

Barrel #3 Installation spreadsheet

 

Pigtails length measurement

 

Mechanical Measurements and Grading of the Ladders

 

Zeiss measurements – at the time of production

 

OGP database (still growing…)

 

Ladder flatness (more to come soon)

 

Cosmic test ladder configuration and survey

(obsolete now…)

 

Photos:

 

NEW Photographs of the Barrel Assembly

 

Photographs of the Barrel Assembly

 

Photographs of the Cosmic Set-up

 

 

Talks:

 

YG’s talk at the collaboration meeting 4/13/00 (.ppt)

 

YG’s talks at the D0 2000 workshop 7/19/00 (.ppt): Calibration and Alignment  and  SMT Assembly Status

 

ORC

 

Barrel Traveler (.xls)

 

Links:

 

To Greg Landsberg’s page

 

To Yuri Gershtein’s page

 

To Silicon home

 

To the DB

 

Back to DØ Home Page

 

 

Last Updated July 7, 2000 by Yuri Gershtein