Members:
Non-Brown:
Special THANKS to:
ARE ASSEMBLED!
Silicon Ladders Installation and Alignment:
Requirements
on ladder placement and survey precision (.doc)
>>>
SHIFT SCHEDULE <<<
Barrel #1 Installation spreadsheet
Barrel #2 Installation spreadsheet
Barrel #3 Installation spreadsheet
Mechanical Measurements and Grading of the Ladders
Zeiss measurements
– at the time of production
Ladder
flatness (more to come soon)
Cosmic test ladder configuration and survey
(obsolete
now…)
Photos:
NEW Photographs of the Barrel Assembly
Photographs
of the Barrel Assembly
Photographs
of the Cosmic Set-up
Talks:
YG’s
talk at the collaboration meeting 4/13/00 (.ppt)
YG’s talks at the D0 2000
workshop 7/19/00 (.ppt): Calibration
and Alignment and SMT
Assembly Status
ORC
Links:
Last Updated July 7, 2000 by
Yuri Gershtein